The overall objective of proposed project CAESAR is the reduction of energy penalty and costs of the SEWGS CO2 capture process through optimization of sorbent materials, reactor- and process design. It is emphasized that with an optimized SEWGS process CO2 avoidance cost could be reduced to < 15/ton CO2. CAESAR takes into account the lessons learned in CACHET in order to bring the SEWGS process a big step closer to the market. To achieve this, CAESAR takes a necessary step back such that novel, more efficient CO2 sorbents with regeneration steam/CO2 ratios less 2 will be developed.
This value is needed to bring the CO2 avoidance costs to about 15/ton. Heat integration and the use of sorbent coatings can further enhance the efficiency. CAESAR will focus on the application of the optimized SEWGS process for pre combustion CO2 capture from natural gas. However the scope of application of SEWGS will be broadened to application in coal gas and industrial processes. A design for a pilot unit will be delivered for these applications. There is a clear delimitation between CACHET and CAESAR.
The emphasis in CACHET was placed on demonstrating the SEWGS process on a larger scale in a continuous, multi-bed SEWGS process demonstrator. CAESAR goes one step further in taking boundary conditions as to cost and efficiency into account. This urges for better sorbents, reactor and process design.
Funded under 7th FWP (Seventh Framework Programme)
Hosting organisation: ENERGY RESEARCH CENTRE OF THE NETHERLANDS